- Technical Parameters
| Item No. | Parameter Name | Technical parameters |
| 1.1 | Equipment Name | Waterless Heating Salt Spray Test Chamber (Dry Heat Type) |
| 1.2 | Equipment Introduction | The waterless heating salt spray testing chamber can simulate various international standards (such as ASTMG85, GB2423-17, 18, GBT10125, ISO9227, IS07384-1986, GB-T229, GB/T10125, GJB150, JISZ2371, VOS, CETP, GMW, DIN, VW, and others). By simulating and intensifying natural environmental conditions, this test chamber can quickly determine the corrosion resistance of the tested materials when exposed to corresponding natural environments, thereby providing users with data and evidence for selecting products or formulations.. |
| 1.3 | Equipment Model | BS-1000WZ |
| 1.4 | Effective Volume | 1000L |
| 1.5 | Internal Chamber Dimensions | 1300×1000×600(W*H*D)(mm) |
| 1.6 | External Dimensions | 1950×1340×1260(W*H*D)(mm) |
| 1.7 | Tested Sample Size | Based on customer’s sample size |
| 1.8 | Sealing Method | Sealing strip |
| 1.9 | Door Opening Method | Manual door opening |
| 1.10 | Brine Tank Size | 120L (Customizable) |
| 1.11 | Chamber Temperature | Room temperature to +50℃ |
| 1.12 | Bubbling Tower Temperature | Room temperature to +63℃ |
| 1.12 | Salt Spray Settling Volume | (1~2) ml/(80cm²·h) (Adjustable) |
| 1.13 | Heating System | Multi-sided indirect radiation heating system |
| 1.14 | Defogging Device | Automatic defogging setting after test completion (Defogging time can be set) |
| 1.15 | Test Brine | Disposable discharge after use; Reuse of brine is strictly prohibited |
| 1.16 | Saturated Tank Metering Device | Equipped |
| 1.17 | USB Interface | Equipped |
| 1.18 | Segmented Timing Function | Suitable for frequent sample loading and unloading daily |
| 1.19 | Salt Spray Waste Gas Collection and Treatment Device (Optional) | Collects and treats the corrosive and harmful mist discharged by the salt spray corrosion test chamber in a centralized manner, facilitating manual centralized treatment |
| 1.20 | RO Reverse Osmosis Pure Water Machine (Optional) | Water Production Rate: 20L/hr @25℃
Conductivity: <5μs/cm Hardness: <0.08mmol/L |
| 1.21 | Weight | 400KG |
| 1.22 | Voltage | 380V |
| 1.23 | Maximum Current | 26A |
| 1.24 | Sample Racks | 2 sets |
| 1.25 | Applicable Test Methods | Suitable for :
Neutral Salt Spray (NSS) Test, Acetic Acid Salt Spray (ASS) Test, Copper-Accelerated Acetic Acid Salt Spray (CASS) Test |
| 1.26 | Measuring Cylinders and Settling Volume Meters (Instruments and Meters) | Third-party CNAS 17025 calibration report is provided |
| 1.27 | Remarks | Spare Parts (Including Heating Wires):
Data Output: Online and offline curve display; Data can be printed & exported in EXCEL and WORD formats; Data can be transmitted to the MES system
Acceptance Criteria: The equipment meets the technical specifications after continuous operation for 240 hours |
- Compliant Test Standards
| Item No. | Standards | Explanation of Standards |
| 2.1 | General standards | GB/T2423.17-2008 Test Methods for Salt Spray |
| GB/T 2423.18-2000 Basic Procedures for Electrical and Electronic Products Test Ka | ||
| GB/T10125-1997 Corrosion Tests in Artificial Atmospheres – Salt Spray Tests | ||
| GB/T10587-2006 Technical Conditions for Salt Spray Test Chambers | ||
| GB10593.2-1990 Methods for Measuring Environmental Parameters of Electrical and Electronic Products | ||
| GB/T1771-2007 Determination of Neutral Salt Spray Resistance of Paints and Varnishes | ||
| GJB150.11A-2009 Salt Spray Test for Military Equipment Laboratories | ||
| 2.2 | Acceptance Execution Standards | Manufacturing Standards: GB/T10586-2006, GB/T10592-2008 |
| Verification Standards: GB/T5170.2-2017, GB/T5170.5-2016 | ||
| Technical Standards: Acceptance according to the signed technical index requirements |
- Equipment Structure
| Item No. | Description | Technical Specification Parameters |
| 3.1 | Cabinet Structure | Integral Resin Transfer Molding (RTM) Process FRP Composite Material Cabinet(It is a composite material that uses glass fibers and their products (glass cloth, tape, felt, yarn, etc.) as the reinforcing material and synthetic resin as the matrix material. Fiber-reinforced composite materials consist of reinforcing fibers and a matrix. The fibers (or whiskers) have a small diameter (generally less than 10μm), with few and minor defects, and a fracture strain within approximately 0.03 (30‰). They are brittle materials, prone to damage, fracture, and corrosion. Compared with fibers, the matrix has much lower strength and modulus but can withstand large strains. It often exhibits viscoelasticity and elastoplasticity, making it a tough material.)The outer cabinet is fully encapsulated with PVC sheets (thickness ≥ 4mm). The cage-type galvanized frame structure ensures a service life of ≥ 8–10 years for the test chamber. |
- Salt Spray System
| Item No. | Description | Technical Specification Parameters |
| 4.1 | Neutral Salt Spray Temperature Range | RT (Room Temperature) ~ 35℃; Pressure Tank Temperature: 47℃ |
| 4.2 | Acid Salt Spray Temperature Range | RT (Room Temperature) ~ 50℃; Pressure Tank Temperature: 65℃ |
| 4.3 | Temperature Uniformity | ±1℃ ~ ±2℃ |
| 4.4 | Temperature Deviation | ±0.5℃ ~ ±1℃ |
| 4.5 | Salt Spray Settling Volume | (1~2) ml/(80cm²·h) (Adjustable) |
| 4.6 | Salt Spray Settling Volume Uniformity | (1.5 ± 0.2) ml/h, with collection duration of at least 16 hours |
| 4.7 | Brine Consumption | 0.4 L/h |
| 4.8 | Compressed Air Consumption | 1.3 cm³/h |
- Control System
| Item No. | Description | Technical Specification Parameters |
| 5.1 | Control Method | The controller adopts a 7-inch color LCD touchscreen + PLC program control module |
| 5.2 | Heating Method | The salt spray chamber is heated by heaters at the bottom and around the chamber, which also completely prevents the corrosive gases inside the chamber from entering and corroding the control components.An immersion heater is installed inside the bubbling tower for humidifying compressed air. |
| 5.3 | Water Replenishment | The water level in the bubbling tower can be automatically replenished via a connecting pipe, or manually injected (optional). |
| 5.4 | Salt Spray Settling Control | The brine flow rate and compressed air pressure are adjusted via the three-stage pressure regulating valves of the brine pump to ensure a uniform salt spray settling volume. |
| 5.5 | Data Storage | Test process data shall be stored in the memory card, and can also be saved in the form of curves, images, etc., with easy editability. |
| 5.6 | Automatic Purge Function | When the chamber door needs to be opened at the end of or during the salt spray test, the equipment will automatically purge the salt spray inside the chamber to prevent salt spray from overflowing and corroding other equipment in the laboratory. |
| 5.7 | Calibration Function | When there is a deviation in the temperature and humidity inside the test chamber, the deviation can be calibrated via the operation interface. |
| 5.8 | Protection Function | The equipment shall be equipped with leakage protection, over-temperature, over-current, water level and other protection and alarm devices. |
- Safety Protection Devices
| Item No. | Technical Specification Parameters |
| 6.1 | When the water level is low, automatically cut off the power supply, and the safety warning light device displays dynamically. |
| 6.2 | When over-temperature occurs, automatically cut off the heater power supply, and the safety warning light device displays dynamically. |
| 6.3 | Leakage protection function to prevent personal injury and instrument failure caused by line leakage or short circuit. |
| 6.4 | Heating system protection function: dry burning of heating tube, abnormal water supply, abnormal drainage |
- Main Accessories List
| Item No. | Description | Brand | Model | Quantity |
| 7.1 | Cabinet | High-Quality Domestic | Custom-Made | 1 set |
| 7.2 | Sealing Strip | Baoshi | Custom-Made | 1 set |
| 7.3 | Door Lock and Hinge Assembly | Baoshi | Custom-Made | 1 set |
| 7.4 | Controller | Weinview | 7.0-inch | 1 set |
| 7.5 | Control Software | Baoshi | Custom-Made | 1 set |
| 7.6 | Heating System | Baoshi | Custom-Made | 1 set |
| 7.7 | Load Switch Assembly | Delixi | C16 | 1 set |
| 7.8 | Solid State Relay (SSR) Assembly | Xinling | HHG1-1/032F-38 | 1 set |
| 7.9 | Switch | Yijia | KCD4 | 1 set |
| 7.10 | Cable | Qifan | RV0.75/1.5 | 1 set |
| 7.11 | Drain Valve | Formosa Plastics | Type 20 | 1 set |
| 7.12 | Overload Valve | Formosa Plastics | Type 20 | 1 set |
| 7.13 | Drain Pipe | Formosa Plastics | Type 20 | 1 set |
| 7.14 | Fixture | Baoshi | Custom-Made | 1 set |
| 7.15 | Mute Adjustable Caster | Baoshi | #SUS304 | 4 pcs |
| 7.16 | Measuring Cup | Baoshi | Custom-Made | 2 pcs |
| 7.17 | Funnel | Baoshi | Custom-Made | 2 pcs |


